The Petone to Grenada Project
NZTA Petone to Grenada Project Website
Publications, including the scoping report.
NZTA’s project FAQ.
Transmission Gully
The “new” proposal to run a highway through Takapu Valley is in fact the “old” Transmission Gully proposal, under a new name and a new project manager.
The official webpage for the Transmission Gully Project.
Transmission Gully links roundup on Stuff.
The Parliamentary Commissioner for the Environment’s Audit of the “Future State Highway Number One Route” Environmental Impact Report (Vol 1 – main report). (The Transmission Gully report, where the Takapu valley alignment is rejected in favour of exiting at Linden. WARNING: 16MB PDF)
Related Roading Projects
The NZTA’s original web page for the Petone to Grenada link road. Note that under “Project Type” it says “Roads of National Significance”.
The NZTA web page for the Roads of National Significance. Note that the Petone to Grenada link is not one.
The NZTA website for the Wellington Northern Corridor RoNS project. Note that the Petone to Grenada link road is not part of the Wellington Northern Corridor RoNS project.
The NZTA website for the Ngauranga Triangle Strategy Study. Lots of chewy technical stuff here, but nothing about the Takapu extension.
The Wellington City Council webpage for Lincolnshire Farm. Note that the site was specifically earmarked to be the terminus of the Petone to Grenada link road. The new suburb has been renamed Hunters Hill.